This suit was tried on the second amended original petition of appellee, Mount Franklin Fuel & Feed Company, against appellant, John Barton Payne, Director General of Railroads, as Agent, for damages alleged to have been occasioned by the alleged wrongful removal of a railway spur track, originally installed and operated by the Galveston, Harrisburg & (San Antonio Railway Company adjoining appellee’s fuel, feed, and plaster bins in the city of El Paso, and in alleged violation of a contract entered into between appellee and said railway company for the construction and operation of such spur track.
The damages prayed for are alleged to have been occasioned on account of extra expense entailed in unloading coal and plaster from cars on the switch as replaced, and for loss of business on account of the removal of the spur track.
Appellee, plaintiff below, alleged its business to be that of a general feed and' fuel business, handled principally from cars set out upon a spur track that served the business of appellee and its predecessors in said business until the removal of said spur track by said Director General. Appellee alleged that its said business, together with its present location and facilities, including said spur track, were formerly owned and operated by the Santa Fé Fuel Company, a corporation, who in the year 1914 transferred and assigned said business, including said spur track, to James Connor, who succeeded to said rights and privileges theretofore enjoyed by the Santa Fé Fuel Company in and to said spur track, and who did business under the name of Mount Franklin Fuel & Feed Company; that Connor thereafter incorporated appellee, and is its principal stockholder, its manager, and president; that said railway on the day named entered into a written contract with its said predecessor, Santa Fé Fuel Company, with respect to said spur track.
The material portions of the contract set out in full in the petition are substantially as follows:
Its date is February 21, 1907; the contract is between the Galveston, Harrisburg & San Antonio Railway Company and the Santa Fé Fuel Company; the contract recites that the fuel company is conducting a general fuel and supply business in the city of El Paso, for which it had purchased a tract of land near the city and adjacent to the right of way of the railway company; that for the convenience and benefit of the fuel company it had directed that a railway spur track be constructed from a connection with the main track of the railway company, and so located as to extend along the south side of the tract of land purchased by the fuel company, describing it; that, in consideration of the covenants contained in the contract on the part of the fuel company to be by it kept and performed, the railway company agrees and binds itself “to contract (evidently meaning to construct) and operate the switch or spur track” to be located according to the map attached and made a part of the agreement. The conditions for the construction and operation of the spur track are, substantially:
(1) “The fuel company will furnish all necessary right of way for proper construction, maintenance and operation of the track as shown on the aforesaid map, title to which right of way shall be conveyed to the said railway company by good and sufficient deed so taken that the land will revert to the said fuel company, its successors or assigns, should the said track be taken up.”
(2) “The fuel company will do all the necessary grading and prepare the roadbed ready for superstructure, this grading to be done and roadbed completed according to survey made by the resident engineer of the railway company or his representative.”
(3) The railway company to pay the actual cost of material and labor required to put in the spur track, the total cost estimated at $887.10.
(4) The fuel company at its expense to keep the spur track in good repair as to material and labor.
(5) The fuel company to maintain a standard lamp on the switch stand of the switch track and have same lighted and cared for in accordance with the rules of the railway company, the railway company to furnish the light, oil, and wick’necessary for the maintenance of the light.
(6) The spur track to be under the exclusive control of the railway company; the railway company to use the spur track as it may see fit; to extend same or connect with other tracks for the convenience of other patrons, provided such use does not interfere with the purpose for which the track is constructed.
(7) Provided that the fuel company is to be responsible for all cars put in the switch track in the event of destruction or damage by fire 'or other causes.
(8) Provides against the placing of material on or within 6 feet of the nearest rail of the track, and in the event of injury to employees, engines, etc., by reason of a failure to observe this provision, the fuel company to pay to the railway company all sums it is caused to pay on account of injuries, etc.
(9) Provides for the delivery by the fuel company to the railway company, or as it may direct all shipments the routing of which it does, or can, or may, control, etc. In the event of failure of the fuel company to comply with the terms of the contract, the railway company has the right, after 10 days’ notice in writing to the fuel company of its intention so to do, to take up and remove the spur track, and the fuel company within 30 days to pay to the railway company all cost and expense incident to the removal, and in addition to pay $887.10, the estimated cost of the material and labor in putting in the spur track.
The contract was executed in duplicate by the railway company and by the Santa Fé Fuel Company.
Appellee pleaded that appellant was es-topped to deny the validity of the assignments, or that said contract was in force and effect from the time the Director General took over the said railroad until same was turned back to the railroad company. Appellee alleges that it made protest to the Director General, who took out the said spur track, and that he, with actual knowledge of the damage to appellee, refused to replace same, and said spur track was not replaced. Appellee alleged that by reason of the taking up of said spur track it has been damaged in the cost of handling coal and plaster, stating the difference in the cost per ton of each, and the tons handled. Appellee further alleged that before the said spur track was removed it. enjoyed á large and lucrative business in dealing in said goods, wares, and merchandise, and would have continued to enjoy said business but for the acts complained of; that appellant for more than 20 months wrongfully deprived it of said spur track, and that, as a consequence directly flowing from said wrongful act, its business was curtailed, stating in detail the number of ears of products it could have handled, and its profits, but could not handle during said time on account of the extra expense in not having the spur track; that by reason of said extra expense it could not compete with its competitors in the same business. Appellee asked judgment for damages in the sum of $7,617.45.
The petition is lengthy, and we have not for that reason at all times followed its verbiage in stating the facts pleaded.
Appellant answered by general demurrer and special exceptions, general denial, and specially that it became necessary to place a double track at the place where the spur track was put in, so that all trains moving on'said track so placed moved in a westerly direction, and all trains on the south or original track moved in an easterly direction; that to have let the switch remain as it was would have made it a facing switch on a one-way track, which would have increased the hazard, and it became necessary to change same and to face same in a different direction from the way in which it originally faced. " '
The case was tried with a jury, and submitted on special issues, resulting in a verdict and judgment in favor of appellee in the sum of $4,134.15.
The first assignment claims error in overruling the general demurrer. The second assignment complains of the' overruling of the first special exception to the petition, in that it is not shown that the railway company, in putting in the switch track, nor the Director General, in operating the railroad, is required to maintain or keep said switch or spur track for any particular period of time.
The words used by the parties in stating the contract are: “The railway company agrees and binds itself to construct and operate the aforesaid switch or spur track”-— stating its location according to a map referred to and designated lines thereon: then follow the conditions under which the railway company agrees to construct and operate said spur track. The' only provision made in the contract with reference to the termination of the contract or removal of the spur track is found in the ninth paragraph, as stated above, and is conditioned on the failure of the fuel company to comply with the terms of the contract. Other than the above, neither the contract nor the petition states the time when the contract is to end, or when the spur track may be taken up. The spur track was put down in the year 1907, and was maintained and operated until June, 1918, when, without notice and over appellee’s protest; it was taken up.
The consideration stated in the contract is the covenants on the part of the fuel company to be by it kept and performed, and the petition states that all the covenants were kept and performed. The petition declares upon a breach of the contract, in that the Director General removed the spur track and replaced only a small part of said track, leaving out about 80 feet of same, and that damages were suffered by appellee by reason of the breach.
We are referred by appellant to a number of cases as sustaining its general demurrer and exceptions to the petition, among them: Texas & Pac. Ry. Co. v. City of Marshall, 136 U. S. 393, 10 Sup. Ct. 846, 34 L. Ed. 385; Whalen v. B. & O. R. R. Co., 108. Md. 11, 69 Atl. 390, 17 L. R. A. (N. S.) 130, 129 Am. St. Rep. 423; Whalen v. B. & O. R. R. Co., 112 Md. 187, 76 Atl., 166; Barney v. Ry. Co., 157 Ind. 228, 61 N. E. 194; Mead v. Ballard, 74 U. S. (7 Wall.) 290, 19 L. Ed. 190; Jones v. Newport News & M. V. Co., 65 Fed. 736, 13 C. C. A. 95; Union Stock Yards Co. v. Nashville Packing Co., 140 Fed. 704, 72 C. C. A. 195.
Space forbids an extended review of each of the above cases. Some of the cases referred to are suits for specific performance of contracts to construct and maintain specified properties at specified places, and from the language used in the contracts the idea of perpetual or permanent maintenance is conveyed.
In the case of Railway v. Camp, 130 Ga. 1, 60 S. E. 177, 15 L. R. A. (N. S.) 594, 124 Am. St. Rep. 151, 14 Ann. Cas. 439, and referred to with approval by Chief Judge Fly in Mosel v. San Antonio & A. P. Ry. Co., 177 S. W. 1048, it was held that contracts, similar to the one under consideration, are valid and binding upon the company so long as it is possible for the company to discharge its duties incumbent upon it by the contract; but when the exigencies of the business of the company are such that the rights of the public come in conflict with the rights of the contracting party under his contract, it is to be presumed that it was the intention of the parties that the private rights under the contract should yield to the public right.
The contract for the construction and operation of the switch track was alleged to be between the Santa Eg Fuel Company and the railway company. There was no provision in the contract as to its assignability by the Santa Eé Fuel Company, and no agreement alleged by which the railway company was to accept other parties in place of the Santa Eg Fuel Company.
Article 583, Vernon’s Say les’ Texas Statutes, provides:
“The obligee, or assignee, of any written instrument not negotiable by the law merchant may transfer to another, by assignment all the interest he may have in the same.”
The ease of Lakeview Land Co. v. San Antonio Traction Co., 95 Tex. 252, 66 S. W. 766, fully discusses and settles the question presented in the assignment against appellant’s contention. See, also, M., K. & T. Ry. Co. v. Carter, 95 Tex. 461, 68 S. W. 159, at page 166. The assignment is overruled.
The damages recoverable, assuming a breach of the contract, would be such as are incidental to and caused by the breach, and may reasonably be supposed to have entered into the contemplation of the parties at the time of making the contract. The contract declared upon and set out in full in the petition recites that the fuel company is conducting a general fuel supply business, and has purchased a tract of land adjacent to appellant’s right of way, and that, for the convenience and benefit of the fuel company it is desired that a railway spur track be constructed, etc., and so located as to' extend along the south side of the said tract of land purchased by the fuel company. Then fol
Tbe damages claimed here are such, it seems to us, as would naturally be expected to follow as a result of tbe removal of tbe spur track. The recitation in tbe contract shows that the railway company and tbe Director General knew tbe character of ap-pellee’s business, tbe material it was handling, the advantage to appellee of having tbe spur track, and the disadvantage in not having the track; and, from tbe length of time tbe spur track was used by appellee and operated by tbe railway company and the Director General, tbe approximate number of cars of coal and plaster handled by appel-lee in a given period of time could have been known to appellant, if not actually known, and tbe number of cars of material appellee could handle without tbe track, as well as tbe method of handling tbe material made necessary by tbe removal of tbe spur track. We think it can be said that tbe parties to tbe contract could contemplate, from tbe contract and its subject-matter and tbe course of dealing under it, that tbe net receipts in handling tbe coal and plaster without tbe spur track would be less than they would be in handling tbe same with tbe spur track in and the cost placed thereon.
Tbe fifth, sixth, seventh, eighth, ninth, and tenth assignments are directed to tbe refusal of tbe court to give an instructed verdict in favor of appellant. A number of. additional propositions are submitted under tbe fifth assignment, some of which are presented under separate assignments.
Tbe evidence seems to us to fully advise tbe management of tbe railroad of tbe facts. Tbe views we express in discussing a previous assignment apply to assignments from tbe sixth to tbe tenth, both inclusive.
“Question No. 1: (a) Was the plaintiff, during tbe time complained of, and prior to March 1, 1920, prevented from handling the commodities as described in its petition, and did it suffer loss of profit thereby by reason of the change in the side track described in its petition? Answer ‘Yes’ or ‘No.’ If you answer ‘Yes,’ then answer: (b) What was the amount of such loss?”
To subdivision (a) the jury answered “Yes.” To (b) tbe jury answered, “$2,500.”
It is claimed under these assignments that there was no evidence that plaintiff was prevented from handling its commodities prior to March 1, 1920, or suffered loss of profits by reason of the change in tbe side track, and that loss of profits is not .an element of damage recoverable in this case. Tbe evidence is too voluminous to quote here.
Tbe evidence, we think, justified tbe submission of special charge. Tbe evidence shows that during the time tbe first or old track was out tbe coal, fuel, and plaster bins were not served at all. Under the nev?’ track arrangement only one car was placed in at a time, and once in 24 hours. With the old trackage facilities five cars of merchandise were handled at one time from tbe cars into tbe storage bins. This could not be done with tbe track as replaced. After the first track was taken out, except as to one car, unloading of cars was done by
The issues presented by the sixteenth assignment, as to the assignability of the contract, and the sufficiency of the evidence to show that it was assigned, have been discussed under previous assignments.
The seventeenth assignment questions the sufficiency of the evidence to sustain the jury’s finding in response to subdivision (a), question 4, to the effect that plaintiff’s damage could not have been diminished by any ordinary diligence on the part of plaintiff. The finding, we think, has evidence to support it. We need not reproduce the evidence, nor discuss the issues presented under the two propositions. From the switch track constructed and operated under the contract, five cars could be and were placed at same time opposite, and unloaded into, appellee’s •bins. With the old switch track removed, and partially replaced by the new, only one car could be put in' opposite the bins' at a time in each 24 hours. It was necessary to unload all cars put on the siding in the 24 ■hours, in excess of the one car, by wagons. The evidence, we think, was- sufficient to show the above facts, and to show the- extra expense of handling the coal and plaster by wagons. Appellant’s proposition to the effect that appellee could have done business in carload lots as expetitiously and cheaply under the new arrangement as under the old, is not sustained by the evidence.
The matters presented under assignments 18 and 19 have been discussed under other assignments. We are inclined to the view that the letters complained of in assignments 20, 21, 22, and 23 were inadmissible under the rule of Hadley v. Baxendale, 9 Exch. 341, but under the facts of this case the error, if any, in admitting same was harmless. The recitations in the contract, the facts surrounding its original execution and existing at the date of its breach by the removal, were abundantly sufficient to charge the railway company with notice of the special damages which would result from its removal.
Furthermore, the case was tried upon special issues, and the letters did not relate to any issue of fact submitted to the jury. Therefore their findings could not have been affected by the letters. It will be assumed that the court found that the special damages were within the contemplation of the parties when the contract was executed, and that his finding was based upon the competent evidence before it.
Appellee had introduced in evidence the fifth clause of the assignment of James Con-nor, the witness, in which he conveyed to appellee—
“all of my right, title, and interest in and to all that certain stock of goods, wares, and merchandise situated (the business involved here), * * * and all of my right, title, and interest in said business,” etc.
We think it was not immaterial. While the clause of the contract introduced showed a transfer, it could not be harmful for- the witness also to state that the. things em
The twenty-fifth assignment claims error in refusing to permit appellant to elicit from .Tames Connor the necessity of double tracking the railroad at the point of the switch track. Appellant’s answer alleged that it was necessary at the place in question to double track the line of the road so that all trains moving on the north track would move in a westerly direction, and to allow the switch to remain as it originally was would necessitate all trains being run against a facing switch point which appellant alleged was dangerous, and for that reason the change in the spur track was made.
The question revolves around the danger feature to the public safety. Unless it be made to appear that it was dangerous to run the trains against the facing switch track, as alleged, we think it would be immaterial to show the necessity to double the road track at the place of the switch, C. R. Merrill, who was superintendent of the railway company at the time of the trial, and was also superintendent on March 1, 1920, testified that—
“It was not dangerous from a standpoint of public policy to have placed that switch in from the east. It would have been more dangerous to have placed it in from the west.”
We are not advised by the brief nor elsewhere, except by the allegation in the answer that appellant expected to show that the switch track would have created a dangerous condition in the double track. As the record appears, we think no reversible error is shown. The record does not show that the witness Powers answered the question submitted as complained of in assignment 26. The question was reframed, and as re-framed, was answered. The assignment does not complain of the question as .answered.
The record shows that the demand for coal and plaster in El Paso from July 1, 1918, to March 1, 1920, was good; that the war had no local effect on the demand for coal. Appellee handled all the retail business it could secure. The limited trackage facilities affected the wholesale business. Appellee did not have facilities for handling cars in large quantities after the track was removed. The witness was familiar with the conditions as to the demand for the commodities handled by appellee, the cost of handling with and without the spur track, and the effect the removal of the track had upon the business. We think his statement was not speculative, was within the contemplation of the parties in putting in track.
What we have said in discussing assignment 27 applies to 28.
After a careful review of the entire record we have concluded that no reversible error is shown, and the case is affirmed.