This is a suit for damages, instituted by appellee against the Galveston-Houston Electric Railway Company, to recover damages alleged to have accrued by reason of the failure of said company to raise the lift bridge on the Galveston Causeway, a structure across Galveston Bay that connects Galveston Island with the mainland. By an amended petition the Gulf, Colorado Santa Fe Railway Company and the Galveston, Harrisburg San Antonio Railway Company were also made defendants. A trial by jury resulted in a verdict and judgment for appellee in the sum of $500.
The causeway from Galveston Island to the mainland has in it a bridge which can be lifted to a perpendicular position so as to leave an open space of 100 feet for the passage of boats. Appellee was the owner of a sailboat, and was desirous of passing through the causeway, and, when he got in 150 or 200 yards of the lift bridge, he blew his horn, and those in charge lifted the bridge until it stood at an angle of about 45 degrees, leaving about 50 feet of the passage-way open. Appellee endeavored to pass through the opening, but failed to do so, and ran his boat into a pier, and damaged it so that it sank in a few moments. Appellee escaped in a small boat.
There was a contract made between *Page 12 Galveston county and appellants, whereby a certain part of the causeway was leased to them for a number of years, in consideration of which lease they agreed, among other things that they would be liable for all damages from a failure to repair and maintain the causeway and bridge, as well as for all dam ages to persons. The duty of operating the lift bridge was placed by the contract or the steam and electric railways. The con tract was approved by the Railroad Commission of Texas, and in the argument of appellee's counsel it is claimed that it was approved by the Legislature of the state.
No evidence of the legislative approval appears in the statement of facts, but this court is referred to the Special Laws of 1909, pp. 601-611. That act should not be considered in the absence of proof of its existence, there being no provision in the act making it a public one and requiring the courts to take judicial notice of it. Holmes v. Anderson,
The duty of lifting the bridge to a perpendicular position whenever those in charge of any vessel, large or small, desired to pass through the opening in the causeway, is not hinted at anywhere in the contract, and, in the absence of any such duty being enjoined upon appellants, it was error to instruct the jury that a failure to lift the bridge to a perpendicular position so as to open the passway for the full 100 feet, etc. As said in the case of Railway v. Hill,
If, under the circumstances attending the passage of the boat through the causeway, it was negligence to lift the bridge only halfway up, and such failure to so lift the bridge was the direct and proximate cause of the disaster, appellee should recover. And, of course, in passing upon the question of negligence of appellants, or the contributory negligence of appellee, the state of the wind and tide and the character of the vessel should be considered by the jury.
The admissions of appellants to the effect that the causeway was opened for traffic some two weeks before the accident, and that the Galveston-Houston Electric Company had, during that time, been operating cars on a regular schedule every hour, precluded the raising of any question as to whether the causeway was still in the hands of an independent contractor.
The contract made the different railway companies jointly liable for damages at the lift bridge. Evidence contradicting the agreement was properly excluded. The authorities cited by appellants have no applicability to the state of facts developed in this case.
For the error indicated herein, the judgment is reversed, and the cause remanded.