DocketNumber: No. 2009AP1615
Judges: Anderson, Brown, Neubauer
Filed Date: 9/8/2010
Status: Precedential
Modified Date: 11/16/2024
¶ 1. Lawrence and Carol Kauer are trying to fight the condemnation of a portion of their land for a road by claiming that the proposed road is unsafe. Specifically, they contend that the DOT's condemnation of their property is a gross abuse of discretion because it is based — according to their expert — on unsafe plans. The DOT, meanwhile, asserts that the road was designed with safety in mind by its team of engineers. The case comes to us as an appeal of summary judgment in favor of the DOT.
¶ 2. The relevant facts of this case are not in dispute. The DOT plans to construct a roundabout with a curved entrance that encroaches on part of the Kauers' property. The affected portion of the land has been condemned for the purpose of building the road. In an effort to prevent the condemnation of their land, the Kauers brought suit under Wis. Stat. § 32.05(5),
¶ 3. Specifically, the Kauers challenge the necessity of the condemnation of their land. Although Wis. Stat. § 32.05(5) allows owners to bring a wide range of cases, case law has made it clear that the necessity of a condemnation will be upheld absent a showing of fraud, bad faith, or a gross abuse of discretion. See Falkner v. Northern States Power Co., 75 Wis. 2d 116, 132, 248 N.W.2d 885 (1977). Wisconsin courts have further clarified that a reviewing court may find a gross abuse of discretion where there is "utter disregard for the necessity of use of the land" or where "the land is taken for an illegal purpose." Watson v. Town of Three Lakes, 95 Wis. 2d 349, 355, 290 N.W.2d 520 (Ct. App. 1980) (citing Swenson v. Milwaukee Cty., 266 Wis. 129, 133, 63 N.W.2d 103 (1954)).
¶ 5. In response to the Kauers' claim, the DOT submitted affidavits of a professional engineer who works for the DOT. She stated that the road design was consistent with the DOT's Facilities. Development Manual, which reflects "sound engineering practice." The DOT moved for dismissal and the trial court granted the DOT's motion. The Kauers appeal. On appeal, the DOT asserts, in essence, that the Kauers do not have standing to debate safety with the DOT in the context of a condemnation procedure.
¶ 6. The standard of review of successful summary judgment motions is well known. Summay judgments are reviewed de novo, applying the same methodology as the circuit court. Green Spring Farms v. Kersten, 136 Wis. 2d 304, 315, 401 N.W.2d 816 (1987). Summay judgment is appropriate in cases where the record shows that there is "no genuine issue as to any material fact and that the moving party is entitled to a judgment as a matter of law." Id. (citing Wis. Stat. § 802.08(2)).
¶ 8. We acknowledge that we could find no Wisconsin case law directly addressing the ability to raise safety as an issue in Wis. Stat. § 32.05(5) proceedings. Because of that, we base our decision on a long line of Wisconsin cases firmly establishing the discretion of the legislature and its delegates
¶ 10. The immense discretion given to the legislature in eminent domain cases reflects an understanding that neither judges nor juries are in the best position to decide issues such as the most appropriate design for a road. See Ashwaubenon, 17 Wis. 2d at 131 (explaining that decisions such as locating or relocating a highway "are not for the courts"). Here, if allowed, a trial would amount to a battle of the experts as to the safety of competing road designs. To allow this kind of debate would be akin to allowing the debates over location and cost that are forbidden by Watson. The Kauers are asking us to allow them a trial in which they can second guess the DOT's decision as to the best design for a road, and that is something we may not and will not do.
¶ 11. We do not hold that safety can never be an issue in a Wis. Stat. § 32.05(5) proceeding. We find it important that in this case, the DOT claimed that its design was created with safety in mind and supported its claim with an expert's affidavit. We can imagine scenarios where safety could be relevant to the issue of necessity. For example, if the DOT's road design was obviously unsafe,
¶ 12. We also note that there are other means by which landowners, or indeed, any citizen may be able to challenge the safety of the DOT's road design. In its brief, the DOT suggests two ways this could be done: through a contested hearing on the safety or human health aspects of a proposed government action, see Wis. Stat. § 227.42, or by establishing standing to challenge the government action judicially under Wis. Stat. § 227.52. According to case law, judicial review under § 227.52 includes "health and safety interests" that are caused by a change in the physical environment. Milwaukee Brewers Baseball Club v. Dep't of Health & Soc. Servs., 130 Wis. 2d 56, 65, 387 N.W.2d 245 (1986). We do not express an opinion as to whether the Kauers' claim would have met the criteria for either type of action; we merely highlight that there are appropriate forums for debating the safety of a DOT-approved road design, but a condemnation action is not one of them.
¶ 13. As mentioned in ¶ 1, supra, there is one remaining issue in this case: the Kauers' claim that there is a jurisdictional defect in the condemnation action because they were not given certain information about their rights, in contravention of Wis. Stat. § 32.05(2a). Their complaint alleges that they were not
¶ 14. This court has noted that all procedural steps which have been found to be jurisdictional defects in condemnation proceedings have two features in common. See City of Racine v. Bassinger, 163 Wis. 2d 1029, 1036-37, 473 N.W.2d 526 (Ct. App. 1991). First, they are all contained within the statutes that put forth condemnation proceedings, Wis. Stat. §§ 32.04-32.185, and second, the statute expressly or impliedly denies power to the condemnor to act where the procedural step is not taken. See id. The Kauers argue that the failure to provide the pamphlet in this case fits the Bassinger characteristics.
¶ 15. It is true that the pamphlets were required by Wis. Stat. § 32.05(2a), which states,"[b]efore attempting to negotiate . . . the condemnor shall provide the owner or his or her representative with copies of the applicable pamphlets." (Emphasis added.) The Kauers argue that the word "shall" in the statute satisfies the second Bassinger characteristic — that the statute expressly or impliedly deny power to the condemnor to act if the step is not met. We disagree.
¶ 16. Our supreme court addressed a similar statutory requirement in Herro v. Natural Resources Board, 53 Wis. 2d 157, 176-77, 192 N.W.2d 104 (1971). In that case, the court held that a similar use of the
The statute here under consideration makes no provisions for any consequences resulting from failure to timely make and file the award. Furthermore, in this case, we are unable to see how the appellant was in any way prejudiced by the late filing of the award. While the late filing of an award by a condemnation commission is not to be condoned, it does not necessarily operate to deprive the condemnation commission of jurisdiction.
Id. at 177.
¶ 17. The Herró holding makes it clear that the word "shall," without more, does not necessarily deny the condemnor the right to act.
¶ 18. When the legislature deems a procedural step to be a jurisdictional prerequisite, it will say so. For example, Wis. Stat. § 32.05(4) explicitly states that notice of the jurisdictional offer "is a jurisdictional requisite to a taking by condemnation." There is no similar statement by the legislature with regard to
By the Court. — Judgment affirmed.
Initially, the DOT moved to dismiss for failure to state a claim upon which relief may be granted, and the trial court's final "order" states that it is granting the DOT's motion and dismissing the complaint with prejudice. However, since parties on both sides submitted briefs with attached affidavits, and since the trial court reviewed that information and referenced it in its decision, and even referred to the proceeding as a summary judgment proceeding, we are treating the order as a
All references to the Wisconsin Statutes are to the 2007-08 version unless otherwise noted.
In their initial briefs, the parties did not directly address the issue of standing to debate safety in Wis. Stat. § 32.05(5) proceedings. Pursuant to an order dated April 6, 2010, both parties provided supplemental briefs on the issue.
No one disputes that the DOT in this case is acting as the legislature's delegate. See Wis. Stat. § 84.09(2).
The example of an obviously unsafe road design that we came up with was a road that leads to the edge of a cliff for no apparent reason.
The relevant part of Wis. Stat. § 32.08(6)(b) (1969) reads, "Within 10 days after the conclusion of such hearing the commission shall make a written award specifying therein the property taken and the compensation." (Emphasis added.)
The court in Herro v. Natural Resources Board, 53 Wis. 2d 157, 176-77, 192 N.W.2d 104 (1971), noted that Wis. Stat. § 32.08(6)(b) (1969) was a time limit requirement. Even though § 32.05(2a) involves a different type of requirement, we find that the same logic applies: the use of the word "shall" in a condemnation procedure statute is not dispositive, as the Kauers assert.